Collection
New Hampshire Historical Property Documentation: Sagamore Creek Bridge, Portsmouth, N.H. (HAER NH-713) Photograph Collection
The Sagamore Creek Bridge was constructed in 1941. The bridge is part of Route 1A and spans Sagamore Creek, a tidal channel. It replaced the original 1850 timber trestle bridge that sat just west of today’s bridge.
Over the years, the City of Portsmouth made several repairs to the structure. In 1984, crews repaired the bridge floor beams and decking. In 2009, a 6-ton weight limit was established. In 2010, 20 deteriorating floor beams were replaced. In 2013, an $8 million project saw the entire bridge closed, removed, and replaced. The grant-funded project was completed by Reed & Reed, Inc. and the bridge reopened on Tuesday December 23, 2014.
Prior to 2013, the bridge was nicknamed “singing bridge” because of the sound made as cars travelled over the grate floor. The grates were removed and did not return during the 2013-14 renovation.
This collection consists of 20 black-and-white photographs of Sagamore Creek Bridge, Portsmouth, N.H. The photos were taken by Charley Freiberg ca. 2010-2013 on behalf of the NH Department of Transportation as part of the Historic Architectural Engineering Record (HAER) NH State No. 713 – Sagamore Creek Bridge. Donated to the library by Sheila Charles, Bureau of Environment Cultural Resources Specialist/Archaeologist, on behalf of NHDOT in September 2025. Scanned and processed by library staff, 2026.
Sources:
City of Portsmouth. (2013.) City of Portsmouth RFP 09-14 Sagamore Creek Bridge Removal & Preservation. files.portsmouthnh.gov/finance/bids/09-14.pdf
Stantec. Bridges past their prime: Sagamore Creek Bridge replacement. www.stantec.com/en/projects/united-states-projects/s/sagamore-creek-bridge-replacement
Over the years, the City of Portsmouth made several repairs to the structure. In 1984, crews repaired the bridge floor beams and decking. In 2009, a 6-ton weight limit was established. In 2010, 20 deteriorating floor beams were replaced. In 2013, an $8 million project saw the entire bridge closed, removed, and replaced. The grant-funded project was completed by Reed & Reed, Inc. and the bridge reopened on Tuesday December 23, 2014.
Prior to 2013, the bridge was nicknamed “singing bridge” because of the sound made as cars travelled over the grate floor. The grates were removed and did not return during the 2013-14 renovation.
This collection consists of 20 black-and-white photographs of Sagamore Creek Bridge, Portsmouth, N.H. The photos were taken by Charley Freiberg ca. 2010-2013 on behalf of the NH Department of Transportation as part of the Historic Architectural Engineering Record (HAER) NH State No. 713 – Sagamore Creek Bridge. Donated to the library by Sheila Charles, Bureau of Environment Cultural Resources Specialist/Archaeologist, on behalf of NHDOT in September 2025. Scanned and processed by library staff, 2026.
Sources:
City of Portsmouth. (2013.) City of Portsmouth RFP 09-14 Sagamore Creek Bridge Removal & Preservation. files.portsmouthnh.gov/finance/bids/09-14.pdf
Stantec. Bridges past their prime: Sagamore Creek Bridge replacement. www.stantec.com/en/projects/united-states-projects/s/sagamore-creek-bridge-replacement