North End House

Parcel 2-9

Date Unknown / Creator Unknown

Collection: North End House HistoryStreet Address: 99 Russell StreetParcel: 2-9
002_09 Front and South Side View.jpg
NameInfoActions
002_09 Text Files.pdfpdf / 276.77 kB Download

Subject property consists of a slightly sloping lot, containing 3,750 square feet, having a frontage 11.8 feet on Russell Street. The land is improved with a one-family dwelling and workshop.

The exterior of the building is in good condition. The foundation is concrete and the walls are asphalt. The windows are wood/double hung.

The interior of the building is in fair to good condition. There is a full cement cellar. The heat is hot air and coal. The plumbing is copper and galvanized. The wiring is Romex, 220 volt with 60 ampere service. The floors ar hardwood and the ceilings are plaster and title.

The exterior of the workshop is asphalt/shingle in good condition.

Tags:

~ “Parcel 2-9,” Portsmouth Public Library's Online Archives, accessed December 23, 2024, https://portsmouthexhibits.org/items/show/17.

Full Item Record

Dublin Core

Title

Parcel 2-9

North End House Item Type Metadata

Parcel #

2-9

Street Address

99 Russell Street

Owner in 1967

Charles Cochiaro

Property Type

Residential

Prior Owner / Purchase Date

Rosie Fiandaca / February 25, 1946

1967 Assessed Value

$1,800

1967 Taxes

$99.90

1967 Estimated Market Value

$7,000

Summary Description

Subject property consists of a slightly sloping lot, containing 3,750 square feet, having a frontage 11.8 feet on Russell Street. The land is improved with a one-family dwelling and workshop.

The exterior of the building is in good condition. The foundation is concrete and the walls are asphalt. The windows are wood/double hung.

The interior of the building is in fair to good condition. There is a full cement cellar. The heat is hot air and coal. The plumbing is copper and galvanized. The wiring is Romex, 220 volt with 60 ampere service. The floors ar hardwood and the ceilings are plaster and title.

The exterior of the workshop is asphalt/shingle in good condition.