North End House

Parcel 6-1

Date Unknown / Creator Unknown

Collection: North End House HistoryStreet Address: 250-252 Market StreetParcel: 6-1
006_01 East Side View.jpg
NameInfoActions
006_01 Text Files.pdfpdf / 332.04 kB Download

Subject property consists of a sloping lot containing 7,055 square feet, having a frontage of 94.6 feet on Russell Street and 92.2 feet on Market Street. The land is improved with a club and commercial building.

The exterior of the building is brick and composition. The windows on the first floor are plate glass - wood sash and the others are wood double hung. The roof is flat buit-up, gable and hip asphalt.

The interior of the building is in fair condition. The heat is oil/warm air on the first floor, gas on the second floor and there is no heat on the third floor. The plumbing is copper and galvanized. The floors are concrete and hardwood. The walls are composition and plaster and the ceilings are composition and metal.

Tags:

~ “Parcel 6-1,” Portsmouth Public Library's Online Archives, accessed November 6, 2024, https://portsmouthexhibits.org/items/show/31.

Full Item Record

Dublin Core

Title

Parcel 6-1

North End House Item Type Metadata

Parcel #

6-1

Street Address

250-252 Market Street
254-256-258-260 Market Street

Owner in 1967

Italian Social Club - Ignazio Ferrera

Property Type

Club/Commercial

Prior Owner / Purchase Date

Salvatore Muccio / September 1, 1926

1967 Assessed Value

$4,900

1967 Taxes

$271.95

1967 Estimated Market Value

$17,000

Summary Description

Subject property consists of a sloping lot containing 7,055 square feet, having a frontage of 94.6 feet on Russell Street and 92.2 feet on Market Street. The land is improved with a club and commercial building.

The exterior of the building is brick and composition. The windows on the first floor are plate glass - wood sash and the others are wood double hung. The roof is flat buit-up, gable and hip asphalt.

The interior of the building is in fair condition. The heat is oil/warm air on the first floor, gas on the second floor and there is no heat on the third floor. The plumbing is copper and galvanized. The floors are concrete and hardwood. The walls are composition and plaster and the ceilings are composition and metal.