North End House

Parcel 9-3

Date Unknown / Creator Unknown

Collection: North End House HistoryStreet Address: Hanover StreetParcel: 9-3
009_03 Front and West Side View.jpg
NameInfoActions
009_03 Text Files.pdfpdf / 340.68 kB Download
009_03 Addiional Text Files.pdfpdf / 193.68 kB Download

Subject property consists of a level lot containing 10,650 square feet, having a frontage of 95 feet on Hanover Street and 96 feet on Hill Street. The land is improved with a garage.

The exterior of the building is 12" concrete block. The windows are metal sash and the roof is metal.

The interior of the building is in excellent condition. The heat is oil warm air in the shop and and a gas wall unit in the office. The plumbing is copper and the wiring is 220 volt industrial in conduits with 200 ampere service. The floors are concrete. The walls are unfinished in the garage, panel in the office and composition on the second floor. The ceilings are unfinished in the garage and composition in the office.

Tags:

~ “Parcel 9-3,” Portsmouth Public Library's Online Archives, accessed March 29, 2024, https://portsmouthexhibits.org/items/show/95.

Full Item Record

Dublin Core

Title

Parcel 9-3

North End House Item Type Metadata

Parcel #

9-3

Street Address

Hanover Street

Owner in 1967

John and Winifred R. Welch

Property Type

Commercial

Prior Owner / Purchase Date

Fred C. Smalley and Sons / August 3, 1961

1967 Assessed Value

$17,000

1967 Taxes

$943.50

1967 Estimated Market Value

$45,000

Summary Description

Subject property consists of a level lot containing 10,650 square feet, having a frontage of 95 feet on Hanover Street and 96 feet on Hill Street. The land is improved with a garage.

The exterior of the building is 12" concrete block. The windows are metal sash and the roof is metal.

The interior of the building is in excellent condition. The heat is oil warm air in the shop and and a gas wall unit in the office. The plumbing is copper and the wiring is 220 volt industrial in conduits with 200 ampere service. The floors are concrete. The walls are unfinished in the garage, panel in the office and composition on the second floor. The ceilings are unfinished in the garage and composition in the office.